Monthly Archives: February 2012

Maintenance Schedules for Building Consents

All building works has an arena of risk about them, and none so more than the area of weathertightness. This risk is an area that needs to be managed just like all other risks with sound management strategies that lower … Continue reading

Share on Facebook
Posted in Case Studies, DBH Determinations, Design, Designers & Architects, Professionals | Leave a comment

Recent wired Mdu System installation

As well as standard Mdu Probe installations in existing buildings, the Mdu System can be wired directly into a new building during construction to provide an invisible, full-protection moisture monitoring system. This wired Mdu System is perfect for new homes … Continue reading

Share on Facebook
Posted in Uncategorized | Tagged | 1 Comment