2002 BRANZ E2-VM1 Sirowet test on Hitex Vented System – Weathertightness and Drainage test
Sirowet test shows Hitex Vented System passes E2/VM1
Key facts
- Date conducted: May 2002
- Conducted by BRANZ at BRANZ testing facilities, Judgeford Wellington
- Aim: To test Hitex Vented System for watermanagement and to test compliance with E2/VM1
- Outcome: Hitex Vented System passed E2/Vma and demonstrated that a small cavity (grooved vents) can successfully drain water oustide at a very small design cost and little change to Hitex face-fixed system.